Memeriksa Body Fitting Dan Body Accuracy (Rank C) |
Klaster |
SKM/0925/00003/3/2018/SS.16/LSP/TMMIN/IV/2018 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
5 Units |
List of Units : Memeriksa Body Fitting Dan Body Accuracy (Rank C)
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WQC.016.01 |
Mengukur Fitting dengan Alat Ukur Manual |
2018 |
3 |
TMMIN.WQC.017.01 |
Mengukur Fitting dengan Gap Gun |
2018 |
4 |
TMMIN.WQC.018.01 |
Memeriksa Accuracy dengan Simple Gauge |
2018 |
5 |
TMMIN.WQC.019.01 |
Mengukur Off Center |
2018 |
|
Perakitan Under Body |
Klaster |
SKM/0925/00003/3/2018/6 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
7 Units |
List of Units : Perakitan Under Body
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WB.001.01 |
Membuat Penomoran Body |
2018 |
3 |
TMMIN.WB.004.01 |
Memasang Part Ke Jig Menggunakan Hanger (Single Dan Sub Assy) |
2018 |
4 |
TMMIN.WB.006.01 |
Mengerjakan Pengelasan Menggunakan Arc Welding |
2018 |
5 |
TMMIN.WB.007.01 |
Memasang Stuad Bolt |
2018 |
6 |
TMMIN.WB.010.01 |
Melakukan Pemeriksaan Kekuatan Point Spot Welding |
2018 |
7 |
TMMIN.WB.012.01 |
Melakukan Transfer Antar Proses Dengan Hanger |
2018 |
|
Memeriksa Function Dan Welding (Rank C) |
Klaster |
SKM/0925/00003/3/2018/1 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
5 Units |
List of Units : Memeriksa Function Dan Welding (Rank C)
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WQC.008.01 |
Memeriksa Welding & Nut dengan Torque Wrench |
2018 |
3 |
TMMIN.WQC.009.01 |
Memeriksa Kekuatan Welding Stud Bolt dengan Stud Tester |
2018 |
4 |
TMMIN.WQC.010.01 |
Memeriksa Welding dengan Chisel |
2018 |
5 |
TMMIN.WQC.025.01 |
Melakukan Pemeriksaan Hasil Aplikasi Sealer |
2018 |
|
Memeriksa Surface Dan Spec Cripple (Rank C) |
Klaster |
SKM/0925/00003/3/2018/2 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
5 Units |
List of Units : Memeriksa Surface Dan Spec Cripple (Rank C)
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WQC.001.01 |
Memeriksa Surface dengan Visual |
2018 |
3 |
TMMIN.WQC.002.01 |
Memeriksa Surface dengan Amplas |
2018 |
4 |
TMMIN.WQC.006.01 |
Memeriksa Spesifikasi Model |
2018 |
5 |
TMMIN.WQC.007.01 |
Memeriksa Kelengkapan Part (Cripple Part) |
2018 |
|
Perakitan Shell Body Touch Up |
Klaster |
SKM/0925/00003/3/2018/3 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
6 Units |
List of Units : Perakitan Shell Body Touch Up
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WB.006.01 |
Mengerjakan Pengelasan Menggunakan Arc Welding |
2018 |
3 |
TMMIN.WB.019.01 |
Melakukan Proses Peasangan Door Dengan Dolly Hanger |
2018 |
4 |
TMMIN.WB.020.01 |
Melakukan Proses Peasangan Door Dengan Dolly Fitting |
2018 |
5 |
TMMIN.WB.022.01 |
Melakkan Proses Pemasangan Rivet |
2018 |
6 |
TMMIN.WB.027.01 |
Melakukan Touch Up Fitting |
2018 |
|
Perakitan Shell Body Sub Assy |
Klaster |
SKM/0925/00003/3/2018/4 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
6 Units |
List of Units : Perakitan Shell Body Sub Assy
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WB.008.01 |
Memasang Sealer Cara Manual |
2018 |
3 |
TMMIN.WB.015.01 |
Transfer Dolly Sluge Dengan Towing |
2018 |
4 |
TMMIN.WB.017.01 |
Melakukan Proses Piercing |
2018 |
5 |
TMMIN.WB.018.01 |
Melakukan Proses Hemming |
2018 |
6 |
TMMIN.WB.023.01 |
Melakukan Pengencangan Bolt/Nut |
2018 |
|
Perakitan Upper Body |
Klaster |
SKM/0925/00003/3/2018/5 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
6 Units |
List of Units : Perakitan Upper Body
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WB.006.01 |
Mengerjakan Pengelasan Menggunakan Arc Welding |
2018 |
3 |
TMMIN.WB.008.01 |
Memasang Sealer Cara Manual |
2018 |
4 |
TMMIN.WB.009.01 |
Memasang Sealer Auto |
2018 |
5 |
TMMIN.WB.012.01 |
Melakukan Transfer Antar Proses Dengan Hanger |
2018 |
6 |
TMMIN.WB.013.01 |
Melakukan Setting Side Member Dengan Under Body Dipresset |
2018 |
|
Pengencangan Bolt Dan Pembersihan Body |
Klaster |
SKM/0925/00003/3/2018/7 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
6 Units |
List of Units : Pengencangan Bolt Dan Pembersihan Body
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WB.005.01 |
Mengerjakan Pengelasan Menggunakan Portable Spot Welding |
2018 |
3 |
TMMIN.WB.016.01 |
Mengganti Cup Tip Portable Spot Welding |
2018 |
4 |
TMMIN.WB.021.01 |
Melakukan PemasanganSmall Part ke Body |
2018 |
5 |
TMMIN.WB.023.01 |
Melakukan Pengencangan Bolt/Nut |
2018 |
6 |
TMMIN.WB.024.01 |
Melakukan Pembersiahan Body |
2018 |
|
Pengoperasian Spot Welding |
Klaster |
SKM/0925/00003/3/2018/8 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
7 Units |
List of Units : Pengoperasian Spot Welding
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WB.002.01 |
Mengerjakan Pengelasan Menggunakan Stationary Spot Welding |
2018 |
3 |
TMMIN.WB.003.01 |
Memasang Part Ke Jig Menggunakan Tangan (Single Dan Sub Assy) |
2018 |
4 |
TMMIN.WB.005.01 |
Mengerjakan Pengelasan Menggunakan Portable Spot Welding |
2018 |
5 |
TMMIN.WB.014.01 |
Melakukan Pelumasan Side Outer |
2018 |
6 |
TMMIN.WB.016.01 |
Mengganti Cup Tip Portable Spot Welding |
2018 |
7 |
TMMIN.WB.024.01 |
Melakukan Pembersiahan Body |
2018 |
|
Pengontrolan Dan Pengujian Material Pelapis Anti Karat (Electro Deposition Coating) |
Klaster |
SKM/0925/00003/3/2018/9 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
8 Units |
List of Units : Pengontrolan Dan Pengujian Material Pelapis Anti Karat (Electro Deposition Coating)
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WF.013.01 |
Melakukan Pengecekan Kekuatan Cat Electro Deposition (ED) |
2018 |
3 |
TMMIN.WF.014.01 |
Melakukan Pengecekan Ketebalan Cat Electro Deposition (ED) |
2018 |
4 |
TMMIN.WF.015.01 |
Melakukan Pengecekan Material Degreasing |
2018 |
5 |
TMMIN.WF.016.01 |
Melakukan Pengecekan Material Water Rinse (Pembilasan) |
2018 |
6 |
TMMIN.WF.017.01 |
Melakukan Pengecekan Material Surface Conditioning |
2018 |
7 |
TMMIN.WF.018.01 |
Melakukan Pengecekan Material Phosphate |
2018 |
8 |
TMMIN.WF.019.01 |
Melakukan Pengecekan Material Cat Electro Deposition (ED) |
2018 |
|
Memeriksa Function Dan Welding (Rank A) |
Klaster |
SKM/0925/00003/3/2018/14 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
5 Units |
List of Units : Memeriksa Function Dan Welding (Rank A)
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WQC.009.01 |
Memeriksa Kekuatan Welding Stud Bolt dengan Stud Tester |
2018 |
3 |
TMMIN.WQC.014.01 |
Memeriksa Kekuatan Welding dengan Non Destructive Test (NDT) |
2018 |
4 |
TMMIN.WQC.015.01 |
Memeriksa Penetrasi Welding dengan Metode Cut Check |
2018 |
5 |
TMMIN.WQC.027.01 |
Mengukur Kegaki Hemming |
2018 |
|
Memeriksa Body Fitting Dan Body Accucary (Rank B) |
Klaster |
SKM/0925/00003/3/2018/17 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
5 Units |
List of Units : Memeriksa Body Fitting Dan Body Accucary (Rank B)
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WQC.020.01 |
Melakukan Kontrol Pin Jig |
2018 |
3 |
TMMIN.WQC.021.01 |
Mengukur Part Accuracy dengan Checking Fixture (CF) |
2018 |
4 |
TMMIN.WQC.022.01 |
Melakukan Inspection Jig Welding |
2018 |
5 |
TMMIN.WQC.023.01 |
Melakukan Fitting Assembly Part X Welding Body |
2018 |
|
Memeriksa Surface Dan Spec Cripple (Rank B) |
Klaster |
SKM/0925/00003/3/2018/19 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
4 Units |
List of Units : Memeriksa Surface Dan Spec Cripple (Rank B)
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WQC.003.01 |
Memeriksa Surface dengan Oil Stone |
2018 |
3 |
TMMIN.WQC.006.01 |
Memeriksa Spesifikasi Model |
2018 |
4 |
TMMIN.WQC.007.01 |
Memeriksa Kelengkapan Part (Cripple Part) |
2018 |
|
Perbaikan Body |
Klaster |
SKM/0925/00003/3/2018/32 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
7 Units |
List of Units : Perbaikan Body
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WB.006.01 |
Mengerjakan Pengelasan Menggunakan Arc Welding |
2018 |
3 |
TMMIN.WB.011.01 |
Melakukan Pemeriksaan Surface Body |
2018 |
4 |
TMMIN.WB.023.01 |
Melakukan Pengencangan Bolt/Nut |
2018 |
5 |
TMMIN.WB.025.01 |
Melakukan Pemeriksaan Fitting (Akurasi Pintu) |
2018 |
6 |
TMMIN.WB.026.01 |
Melakukan Perbaikan Surface |
2018 |
7 |
TMMIN.WB.027.01 |
Melakukan Touch Up Fitting |
2018 |
|
Painting Pengontrolan Material Pretreatment ED |
Klaster |
SKM/0925/00003/3/2018/33 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
10 Units |
List of Units : Painting Pengontrolan Material Pretreatment ED
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.T.001.01 |
Melakukan Distribusi jig (handling jig) |
2018 |
3 |
TMMIN.T.002.01 |
Melakukan Pengisian Material Pre Treatment Ed |
2018 |
4 |
TMMIN.T.003.01 |
Melakukan Pengecekan Material Degreasing |
2018 |
5 |
TMMIN.T.004.01 |
Melakukan Pengecekan Material Water Rinse ( pembilasan ) |
2018 |
6 |
TMMIN.T.005.01 |
Melakukan Pengecekan Material Surface conditioning |
2018 |
7 |
TMMIN.T.006.01 |
Melakukan Pengecekan Material Phosphate |
2018 |
8 |
TMMIN.T.007.01 |
Melakukan Pengecekan Material ED (electro deposition) |
2018 |
9 |
TMMIN.T.008.01 |
Melakukan Pemasangan Jig ke Body |
2018 |
10 |
TMMIN.T.022.01 |
Melakukan Pengisian Material Cat Painting |
2018 |
|
Painting Pemberian Cat Pada Body Mobil |
Klaster |
SKM/0925/00003/3/2018/34 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
5 Units |
List of Units : Painting Pemberian Cat Pada Body Mobil
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.T.009.01 |
Melakukan Pengecekan Defect Body |
2018 |
3 |
TMMIN.T.017.01 |
Melakukan Pembersihan Body (Proses Tag Rag) |
2018 |
4 |
TMMIN.T.018.01 |
Melakukan Pengecatan Body |
2018 |
5 |
TMMIN.T.022.01 |
Melakukan Pengisian Material Cat Painting |
2018 |
|
Painting Pemberian Lapisan Peredam Dan Pencegah Kebocoran |
Klaster |
SKM/0925/00003/3/2018/35 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
8 Units |
List of Units : Painting Pemberian Lapisan Peredam Dan Pencegah Kebocoran
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.T.011.01 |
Melakukan Pemasangan Plug Hole |
2018 |
3 |
TMMIN.T.012.01 |
Menutup Sambungan Plat (Proses Sealer) |
2018 |
4 |
TMMIN.T.013.01 |
Memberikan Lapisan Peredam (Spray Pvc) |
2018 |
5 |
TMMIN.T.014.01 |
Merapihkan Hasil Aplikasi Proses Sealer (Finishing Sealer) |
2018 |
6 |
TMMIN.T.015.01 |
Memberikan Peredam Getaran (Proses Silencer) |
2018 |
7 |
TMMIN.T.030.01 |
Melakukan Proses Pengisian Material Sealer |
2018 |
8 |
TMMIN.T.031.01 |
Melakukan Proses Handling silincer |
2018 |
|
Painting Melakukan Repair Black Out |
Klaster |
SKM/0925/00003/3/2018/36 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
7 Units |
List of Units : Painting Melakukan Repair Black Out
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.T.020.01 |
Melakukan Proses Block Polishing |
2018 |
3 |
TMMIN.T.024.01 |
Melakukan Pemasangan Frame Tape |
2018 |
4 |
TMMIN.T.025.01 |
Melakukan Proses Spray Wax |
2018 |
5 |
TMMIN.T.026.01 |
Melakukan pproses spray Black Out |
2018 |
6 |
TMMIN.T.027.01 |
Melakukan Proses Pelepasan Jig dari Body |
2018 |
7 |
TMMIN.T.028.01 |
Melakukan Proses Scan Barcode |
2018 |
|
Painting Perbaikan Cacat Setelah Proses Top Coat |
Klaster |
SKM/0925/00003/3/2018/44 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
5 Units |
List of Units : Painting Perbaikan Cacat Setelah Proses Top Coat
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.T.020.01 |
Melakukan Proses Block Polishing |
2018 |
3 |
TMMIN.T.021.01 |
Melakukan Proses Spray Touch Up |
2018 |
4 |
TMMIN.T.023.01 |
Melakukan Proses Metal Repair |
2018 |
5 |
TMMIN.T.028.01 |
Melakukan Proses Scan Barcode |
2018 |
|
Painting Perbaikan Cacat Sebelum Proses Top Coat |
Klaster |
SKM/0925/00003/3/2018/45 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
7 Units |
List of Units : Painting Perbaikan Cacat Sebelum Proses Top Coat
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.T.009.01 |
Melakukan Pengecekan Defect Body |
2018 |
3 |
TMMIN.T.010.01 |
Melakukan Perbaikan Defect (Repair) |
2018 |
4 |
TMMIN.T.016.01 |
Memberikan Lapisan Pelindung Cat (Anti Chipping) |
2018 |
5 |
TMMIN.T.019.01 |
Melakukan Proses Pendataan Defect |
2018 |
6 |
TMMIN.T.027.01 |
Melakukan Proses Pelepasan Jig dari Body |
2018 |
7 |
TMMIN.T.029.01 |
Melakukan Proses Cleaning Mondansen |
2018 |
|
Pelapisan Anti Karat Rangka Kendaraan Roda Empat (Electro Deposition Coating) |
Klaster |
SKM/0925/00003/3/2018/10 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
8 Units |
List of Units : Pelapisan Anti Karat Rangka Kendaraan Roda Empat (Electro Deposition Coating)
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
LOG.OO18.002.01 |
Menggunakan Perkakas Bertenaga/Operasi digenggam |
2004 |
3 |
TMMIN.WF.004.01 |
Memperbaiki Defect Las Metal Active Gas (MAG) Welding |
2018 |
4 |
TMMIN.WF.010.01 |
Melakukan Proses Dipping Frame Assy Pada Tanki Degrease |
2018 |
5 |
TMMIN.WF.011.01 |
Melakukan Loading Unloading Frame Assy Menggunakan Crane |
2018 |
6 |
TMMIN.WF.012.01 |
Melakukan Perbaikan Defect Cat Electro Deposition (ED) |
2018 |
7 |
TMMIN.WF.013.01 |
Melakukan Pengecekan Kekuatan Cat Electro Deposition (ED) |
2018 |
8 |
TMMIN.WF.014.01 |
Melakukan Pengecekan Ketebalan Cat Electro Deposition (ED) |
2018 |
|
Memeriksa Surface Dan Spec Cripple (Rank A) |
Klaster |
SKM/0925/00003/3/2018/15 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
5 Units |
List of Units : Memeriksa Surface Dan Spec Cripple (Rank A)
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WQC.004.01 |
Memeriksa Surface dengan Raba |
2018 |
3 |
TMMIN.WQC.005.01 |
Memeriksa Numbering (Nomer Rangka) |
2018 |
4 |
TMMIN.WQC.006.01 |
Memeriksa Spesifikasi Model |
2018 |
5 |
TMMIN.WQC.007.01 |
Memeriksa Kelengkapan Part (Cripple Part) |
2018 |
|
Memeriksa Body Fitting Dan Body Accucary (Rank A) |
Klaster |
SKM/0925/00003/3/2018/16 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
4 Units |
List of Units : Memeriksa Body Fitting Dan Body Accucary (Rank A)
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WQC.021.01 |
Mengukur Part Accuracy dengan Checking Fixture (CF) |
2018 |
3 |
TMMIN.WQC.022.01 |
Melakukan Inspection Jig Welding |
2018 |
4 |
TMMIN.WQC.024.01 |
Mengukur Akurasi dengan Alat Ukur 3 Dimensi |
2018 |
|
Memeriksa Function Dan Welding (Rank B) |
Klaster |
SKM/0925/00003/3/2018/18 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
5 Units |
List of Units : Memeriksa Function Dan Welding (Rank B)
# | Unit Code | Unit Name | Year |
1 |
LOG.OO01.002.01 |
Menerapkan Prinsip-Prinsip Keselamatan Dan Kesehatan Kerja Di Lingkungan Kerja |
2004 |
2 |
TMMIN.WQC.011.01 |
Memeriksa NP (Number & Position) Welding |
2018 |
3 |
TMMIN.WQC.012.01 |
Memeriksa Appearance Welding |
2018 |
4 |
TMMIN.WQC.013.01 |
Memeriksa Kekuatan Welding dengan Destructive Test Senuke |
2018 |
5 |
TMMIN.WQC.027.01 |
Mengukur Kegaki Hemming |
2018 |
|
PERAKITAN KOMPONEN ENGINE (RANK C) |
Klaster |
SKM/0925/00003/3/2020/79 |
LSP TMMIN
Kab. Karawang |
Industri Kendaraan Bermotor, Trailer, dan semi Trailer |
Industri Pengolahan |
7 Units |
List of Units : PERAKITAN KOMPONEN ENGINE (RANK C)
# | Unit Code | Unit Name | Year |
1 |
C.28LOG20.003.2 |
Menerapkan Prinsip-prinsip K3 di Tempat Kerja |
2018 |
2 |
TMMIN.A.005.01 |
Melakukan Pemasangan Hose |
2017 |
3 |
TMMIN.A.010.01 |
Mengambil Part (Shopping Part) |
2017 |
4 |
TMMIN.A.011.01 |
Melakukan Scanning Part |
2017 |
5 |
TMMIN.A.013.01 |
Mengoperasikan Torque Wrench |
2017 |
6 |
TMMIN.EA.010.01 |
Memasang Clip pada Hose |
2019 |
7 |
TMMIN.EA.012.01 |
Memasang Wire Engine (Test Engine) |
2019 |
|